Is it possible to control the number of concurent agents running at the same time?

Hello,

Is it possible to control the number of concurent agents running at the same time?

Thanks.

Regards

Ramunas

Subject: Is it possible to control the number of concurent agents running at the same time?

schedules agents ? or web agents ? if schedule, there is a parameter on the server. I think 1 Amgr task can run 1 agent at a time, to u can control number of concurent agent with this

Subject: RE: Is it possible to control the number of concurent agents running at the same time?

I’m talking about web agents.

Subject: RE: Is it possible to control the number of concurent agents running at the same time?

web agent time out and the number of concurrent agents are control separately froms scheduled agents, here is a previous post where I specify where:http://www-10.lotus.com/ldd/nd6forum.nsf/55c38d716d632d9b8525689b005ba1c0/725d6b29fbf6d9f685256d9700822711?OpenDocument

For scheduled agents, the number is controlled on the Agent Manager tab in the server record.