9.0.1FP9 & 10 cannot upgrade after April 19

I am running 9.0.1FP8. Tried to upgrade to 9.0.1FP10 and it failed. Known issue if you try to upgrade after April 19. Must wait until IF3

http://www-01.ibm.com/support/docview.wss?uid=swg22015805 http://www-01.ibm.com/support/docview.wss?uid=swg22015805

Notes (W32 and MAC64), and Sametime 9.0.1 FP1 Standalone and Embedded ST Clients fails with a certificate error

Subject: Fix: IF3 is now available

http://www-01.ibm.com/support/docview.wss?uid=swg21657963 http://www-01.ibm.com/support/docview.wss?uid=swg21657963

PCMAAXZNQB - Resolved Notes or embedded Sametime installation fails with error “Cwpst1002w: Signature Has Expired”

Subject: 9.0.1FP9 & 10 cannot upgrade after April 19

I am running 9.0.1FP8. Tried to upgrade to 9.0.1FP10 and it failed. Known issue if you try to upgrade after April 19. Must wait until IF3

http://www-01.ibm.com/support/docview.wss?uid=swg22015805 http://www-01.ibm.com/support/docview.wss?uid=swg22015805

Notes (W32 and MAC64), and Sametime 9.0.1 FP1 Standalone and Embedded ST Clients fails with a certificate error

Subject: Cure was to reinstall FP8

My Notes client was unusable. I had to run the FP10 install again and tell it to uninstall. Then I ran the FP8 install again. I can use my Notes now until they come out with FP10IF3