What pmr 37069,500 is telling me is that the user still gets the option to “Don’t upgrade now”. That option (qb-!) just stops the dialog box during the upgrade, after they accept the upgrade.
They are telling me that I should modify the desktop setting and put a “Deploy Version” in there (which pmr 36508,500 said not to leave blank). Once I use a deploy version then I can turn on an upgrade deadline and a “remind me every hour”. Using an upgrade deadline should grey out the “Upgrade Later” option.
Does this sound right?
I don’t think 36508 is solvable because the smart upgrade tracking database is full of holes. I’d rather have the grey out than to have smart upgrade tracking.