Hi there,
I need some of your design idea regarding something I created.
I have a main document, that are filled with informations. In this document, I have an embedded view. In this same document, I created an action button that create sub-documents (shown in the embedded view). Thoses sub-documents are “steps” in a building process and are dated. IE:
conception / 14-06-2005
review / 16-06-2005
packaging / 17-06-2005
shipping / 18-06-2005
Each steps are a distinct document, with a field called DateJob. This field must be editable.
I want idea on how I can do, if a date is changed (for exemple the “review” date in this example), the sub-job (packaging and shipping) to be updated. If we add 1 day to the review stage, 1 day is added to the packaging and shipping stage.
For the moment, the only one thing that linked all those document together are the job number. There is a job number field in all thoses documents that are taken from the main document.
Any suggestion would be appreciated.