Subject: How to upgrade Domino 6 to 7 on a new box?
I would either upgrade the existing box to 7 then do the move, or put 6.5 on the new box, do the move and then upgrade to 7.
If your old system and your new system match, you should be able to trick everything into never knowing anything changed. This plan is not all my own work - there’s a technote somewhere on the site which I adapted.
1.Make complete backup of the old box (just in case!)
2.Create Domino installation directory and data directory on the new box
3.Copy all data files from old box to new box including:
All .nsfs
server.id
administrators.id
cert.id
all user.ids
names.nsf
certlog.nsf
notes.ini (but rename)
4.Install Domino on the new box
Use original server, admin and cert.ids
Use exactly the same server name and domain names
5.Disconnect new server from network. Launch the server. The configuration Notes client will launch. Select the “First Server Setup” and complete all necessary fields
6.Start the Domino to verify that it installed correctly
7.Shut down the Domino server
8.Replace notes.ini on new box with renamed .ini from step 3
9.Shut down the old box
10.Replace IP address (and hostname?) on new box with old box’s IP address
11.Connect new box to Network
12.Bounce new box
13.Start Domino on new box
All clients/other servers etc should never notice the difference. And you haven’t changed the old box at all, so you’ve got a built in disaster recovery/roll back plan should anything go pear shaped.
You probably could move to the new box and new version at the same time, but if anything doesn’t work, you won’t know what caused the problem and would make it a nightmare to troubleshoot.
Hope this helps!
Or if you come up with a better plan, let me know, as I’m doing this myself over the next few weeks.
Kirsty