Calendar

I have some calendars which show a blank view (no calendar, no lines showing days), but only on the Whole Month view with Time Slots selected. With summery selected, it displays like One Week.

I have refreshed design, replaced design (with same template), made new local replica, made a new copy, refreshed the view, they all have the same problem. All the events are still in the database since they show in week views.

Any help?

Thank you,

Durwin

Subject: Calendar

I had FP9 installed. I found that installing FP7, calendar shows normally.

I have learned that FP9 and 10 are buggy. FP10 would case failure to launch client. FP9 caused this calendar problem.

Thank you,

Durwin